2005-Wilder Gulch and Gold Hill Trail Restoration

Calendar Happens On Jul 30, 2005
Expired

Description

Start Date-End Date: 07/30/2005-01/00/1900 Land Manager Office: Land Manager Contact: Funding Partner: Programmatic Partner: Summary: Rerouting trail segments and building drainage structures to redude erosion in the White River National Forest. Description: White River National Forest, the United States' most popular national forest, is home to world-renowned ski resorts and endless recreation for outdoor enthusiasts. Coloradans are blessed to have this unparalleled playground in the heart of our state. Diminishing funds and limited resources have made it difficult for the Forest Service to manage the 2.3 million acres that make up the White River, one of the biggest forests in the national forest system. To provide safe and sustainable trails for hikers, bikers and equestrians, volunteers will reroute sections of trail on two of the most heavily used trails. Located at the top of Vail Pass, sections of the Wilder Gulch Trail are currently under water due to poor design and drainage. The Gold Hill Trail, a segment of the Colorado Trail outside Breckenridge, is constructed on steep, rocky terrain and is eroding at an alarming rate. By rerouting segments of each trail and building well-placed drainage structures to reduce erosion, volunteers will assure the longevity of this incredibly popular trail system. Latitude/Longitude: Additional Information: Camping Available: Physical Difficulty: Difficult High Altitude Project: Desired Number of Volunteers: 0 Total Adult Volunteers Attended: 264 Total Youth Volunteers Attended: 31 Total Volunteer Days: 295 Total Unique Volunteers: 163 Total Volunteer Hours: 1104 Staff Hours: 0 Stipend Hours: 0 Project Summary: Successes and Challenges: Lessons Learned: Special Notes: Stewardship Education: Key Concerns or Comments from Staff or Volunteers: Description of Accidents/Incidents: Description of Work Completed:

Details

Get Connected Icon 12 and older